首頁
1
最新消息
2
橋梁工程
3
Improvement of the section of the 13th line Fen-ghu School to Bei-shi Bridge4
http://www.prestress.com.tw/ 預力國際有限公司
預力國際有限公司 新北市汐止區新台五路一段81號8樓之3
Location:           Miaoli County, Taiwan Date Started:    Feb 2018      Date Completed:     July 2018 Owner: Directorate General of Highway, MOTC Designer:    T.Y.Lin Engineers & Consultants Ltd. Main Contractor:  Jia-xin Construction Co., Ltd. PT Supplier & Stressing:  Tpt Systems Ltd.           PT System Details:  Live End Anchorage: 12T/12.7mmφ. http://www.prestress.com.tw/hot_517136.html Improvement of the section of the 13th line Fen-ghu School to Bei-shi Bridge 2025-06-18 2026-06-18
預力國際有限公司 新北市汐止區新台五路一段81號8樓之3 http://www.prestress.com.tw/hot_517136.html
預力國際有限公司 新北市汐止區新台五路一段81號8樓之3 http://www.prestress.com.tw/hot_517136.html
https://schema.org/EventMovedOnline https://schema.org/OfflineEventAttendanceMode
2025-06-18 http://schema.org/InStock TWD 0 http://www.prestress.com.tw/hot_517136.html

Location:           Miaoli County, Taiwan

Date Started:    Feb 2018     

Date Completed:     July 2018

Owner: Directorate General of Highway, MOTC

Designer:    T.Y.Lin Engineers & Consultants Ltd.

Main Contractor:  Jia-xin Construction Co., Ltd.

PT Supplier & Stressing:  Tpt Systems Ltd.          

PT System Details:  Live End Anchorage 12T/12.7mmφ.

回列表 下一個